The production of high-quality concrete pump trucks is the company’s primary focus at Henan Daswell Machinery Co., Ltd. Today we will go over the safety precautions that should be taken while operating a concrete pump truck. The Henan Daswell Equipment Co., Ltd. is a professional manufacturer and dealer that has been focusing in the research, development, and manufacturing of construction machinery for about 30 years now. The following is a list of our primary products: batching plants and concrete batching plants, concrete mixers, blocking producing machines, concrete pumps, and so on. 1. The operator of a concrete pump truck is required to receive specialized training, be knowledgeable about the pump’s mechanical properties, master pump operating methods and precautions, fulfill security responsibilities at every step of the production process, and adhere to relevant safety requirements. 2. Users of the concrete pump shall adhere to the standard operating procedures while pumping concrete. Pipe couplings and valves must not be damaged in any way. As a support system, the pipe rack has to be durable and able to separate itself from the pumping site. Users are required to run water through the pipe in order to verify its integrity before they can begin pumping. 3. When working with concrete admixtures, the crew must take precautions to prevent corrosion and act responsibly. 4. The spot where the concrete pump truck parks must be made of hardened, smooth, and solid material. To avoid collapse, good drainage is built into the structure. 5. When you are connecting the pump tubes, you will need to put up racks that are dependable and solid. It is possible to employ anchored steel to stiffen the racks, which allows for swinging. 6. You are required to use a particular bayonet when connecting the conveying pipe at the concrete mixing plant. During the building process, there must to be a bayonet and other wearing accessories on standby. 7. When removing the pipe, operators should remove it from the top down and the front back according to the top-down and front-back concept. After the pipe has been removed, the components should be laid out on level ground and not stacked. 8. After the pump tube has been removed, it must be laid out on the ground in order to be cleaned and inspected. In the event that there is any damage, it need to be rectified in a timely manner. 9. You need to make arrangements for full-time people to do routine inspections of the pipe while the concrete pump truck is operating. The crew need to promptly arrange maintenance on the pipe in the event that there is anything wrong with it. 10. Before the concrete pump can begin working, the operation site’s extensive communication system has to be set up in order to guarantee the construction site’s safe management.